Automated PCB Return Conveyor — Siemens S7-1200 PROFINET
Automated PCB Pallet Return & Buffer System
Material-handling crew cut from 5 to 2 operators
- Siemens S7-1200
- PROFINET
- S7 Communication (PUT/GET)
- Delta ASD-B3
- Leadshine DM542J
- Pulse-train motion control

The challenge
Empty PCB pallets had to travel back from the end of the test line to its start, and moving them took a material-handling crew of 5.
The goal was an automated return path about 50 m long, with a buffer for 13 pallets.
Solution & control architecture
Distributed PLCsSiemens S7-1200 × 13Linked over PROFINET (S7 Communication PUT/GET)
-
Pulse
- 2 liftersDelta ASD-B3 servo raises and lowers the pallets, one at each end
-
Pulse
- 11 conveyor modulesStepper motors (Leadshine DM542J) carry the pallets
-
- HMIOperator panel on the control cabinet
- Control: Distributed PLC architecture using 13 Siemens S7-1200 PLCs linked via PROFINET (S7 Communication / PUT-GET).
- Motion: A lifter at each end raises and lowers the pallets with a Delta ASD-B3 servo driven by pulse signals from the S7-1200 PLC; the 11 conveyor modules in between carry the pallets on stepper motors (Leadshine DM542J drivers).
Electrical drawings (excerpts)
A few pages from the project's EPLAN drawing set. Click a drawing to open it full size.
Results
- Reduced material-handling workforce from 5 to 2 operators (saving 3 FTEs).
My role
PLC programming, HMI design, Electrical design
Skills and deliverables
- PLC Programming
- SCADA
- Electrical Design
- Motion Controller
- HMI Design
- Electrical Panel Design
Need a similar machine?
Have a machine, line or automation project in mind? Message me on any channel below with a short description and I'll get back to you.
To get a quote faster, include:
- Machine or line type and what it needs to do
- PLC / HMI brand and model, if already chosen
- Scope: electrical design, programming, vision or commissioning
- Deadline, plus drawings, photos or existing code if you have them



